Furnace Frame Rebuild

Furnace Frame Rebuild

Furnace Frame Rebuild

Once the furnace was re-designed (prior post), of course the next step is to implement it.

Here Christian is cutting some stainless chips like a metal shop champ
Here Christian is cutting some stainless chips like a metal shop champ
Taking our time cutting the hard stuff
Taking our time cutting the hard stuff
Stainless steel collars cut and drilled
Stainless steel collars cut and drilled
Tap tap tap and some more tapping
Tap tap tap and some more tapping
Frame stripped down. Added some new threaded holes to clamp our thermal blanket.
Frame stripped down. Added some new threaded holes to clamp our thermal blanket.
A few coats of 2000F rated paint to protect the steel
A few coats of 2000F rated paint to protect the steel
Ready to reassemble.
Ready to reassemble.
We took the rebuild opportunity to add an additional thermal break
We took the rebuild opportunity to add an additional thermal break
All ready for the refractory blanket insulation installation
All ready for the refractory blanket insulation installation

About the Author

Leave a Reply